1. Home
  2. New Construction Condos For Sale in Surfside

New Construction Condos For Sale in Surfside

New construction condos for sale in Surfside let a buyer choose a residence while the building is still being designed and built, instead of taking a unit as it already stands. The decision ahead is how much a plan can promise and how far a project has actually advanced.

On this page: How a New Surfside Project Is Laid Out Before It Exists·Reading a Project Plan When There Is No Finished Unit Yet·A Permit Is Not a Key: What Stage and Rules Mean for a New Surfside Project·Start With the Project You Have in Mind·Is a Unit Listed as New Construction Already Built?

Save this search and a new Surfside condo reaches you as soon as it is listed.

How a New Surfside Project Is Laid Out Before It Exists

A new Surfside condo project is defined by its documented programme: how many residences it holds, how large they are and how the building is designed. The Delmore at 8777 Collins Avenue in Surfside shows what such a programme looks like. When DAMAC launched this Surfside condo project on 28 January 2025, it was planned as 37 residences on 12 floors with 4 to 5 bedrooms, so each floor holds only a few homes. Zaha Hadid Architects describe the building as two parts with a central canyon between them, wide terraces, and balconies offset from one another, so outdoor space on one level is not stacked directly under the next.

In my view The Delmore stands out for its large residences in a small building, and it will not suit a buyer who wants a compact unit or a home ready to move into now.

Reading a Project Plan When There Is No Finished Unit Yet

A plan or fact sheet for a new Surfside condo tells what is intended for a residence, and the unit that is delivered can differ from it. The Delmore fact sheet issued for the project lists a separate temperature-controlled garage for each residence, so the owner’s car is not parked in a shared lot. It also lists private elevator foyers, so the lift opens to one residence only, along with wraparound terraces and separate chef’s kitchens, which give room to cook apart from the living space. On the plan, the owner steps out of the private lift into their own foyer and crosses the residence to a terrace that wraps around it.

The project’s original plan of Residence 202, on the second floor, shows 5 bedrooms, 5.5 bathrooms, 7,574.29 square feet inside and 960.08 square feet outside, with a study, a media room and a laundry among its room labels. Neither document confirms a right to the outside area shown on the drawing.

A Permit Is Not a Key: What Stage and Rules Mean for a New Surfside Project

For a new Surfside condo, a permit already issued and a completion year already announced do not mean the residence is ready for keys. Zaha Hadid Architects report that a foundation permit for The Delmore in Surfside was issued and piling works followed deep soil mixing; that is a permit for the foundation, not an occupancy permit or a date for keys. The same announcement that launched the project expected completion in 2029, which is an expectation from a dated announcement, not a delivery date.

Florida law sets different disclosure rules for a Surfside condo bought from a developer than for a resale condo, so a buyer receives a different set of documents depending on who sells.

Start With the Project You Have in Mind

I’m Ory Pelyo, a licensed Broker Associate with more than ten years in Miami real estate. Before any viewing I narrow new Surfside projects to the residences that match your request, so your time goes only to the ones worth seeing. Part of my search is sourcing to a client’s request and properties that come to me directly, off the open market. Tell me what you’re looking for, or send me the new Surfside residences you are already considering, by email, on WhatsApp or with a call to +1 305-874-9500, and we will talk through the ones that fit what you described.

Is a Unit Listed as New Construction Already Built?

Not necessarily. A third-party listing for The Delmore #702 in Surfside (MLS, October 2026) classifies it as Residential / Condominium with Year Built 2029, a year still ahead at the time of listing. Current new construction offers in Surfside appear in the listings on this page, and a renovated older building does not become new construction through renovation alone.

Edit Search

  • Email Updates
  • Only Update me On
Close
Email Sent! Your email was sent successfully
Close
Register
  • Thank You For Registering

    Just a few more details so we can help you

    (All fields are required)

    When are you looking to purchase?
  • Thank You For Registering

    Just a few more details so we can help you

    (All fields are required)

    Need assistance with financing?
  • Thank You For Registering

    Just a few more details so we can help you

    (All fields are required)

    Need to also sell your property?